Hi guys!

I can't believe its time for the first reveal of one of the rooms in our remodeled home!! I'ts been a long time coming and to be honest I've just been slammed with my day job that when I have free time I'm lounging in our pool :) Hopefully the winter will come way more home update posts!


BEFORE




AFTER



ITEMS:

sink: wayfair

laundry machines: samsung

countertop: Blizzard Quartz from United Granite Distributors in Willowbrook, IL- installed by Luis (773-368-2695)

cabinets: k&b cabinets

cabinet pulls: emtek

pampas grass: etsy

touch faucet: amazon

soap dispenser: amazon

floor tile: tile shop - metropolis light grey fan polished- installed by Dan and Jon (708-785-4004)

backsplash: tile shop - meram blanc carrara marble chevron

rod hander: cb2

8 inch leather straps for hanger: etsy

towel: target

step stool: amazon/ikea

laundry hoses: amazon

heated floors: WarmlyYours - installed by Dan Baltatu (630-915-2950)

dryer balls: bed bath

rugs: amazon



You can follow all our home reno youtube videos here!

All my home reno blog posts are also here


You can find more house updates on my insta stories and vlogs


Don't forget to check out my Amazon Page that lists all my favorites on there- clothing, bathing suits, beauty products and more.

xoxo ela

Hi guys!

I really thought I had thought of everything when we put together our budget and there were several things that came up along the way that I had completely forgot about! I listed everything below and even linked everything we bought.


I forgot:

-Closet lights (with and without a pull chain)

-Door stoppers (attaches to your baseboard)

-Door stoppers (attaches to the door hinge if a baseboard isn't behind it)

-Combined Smoke/Carbon Monoxide Alarms

-Light Bulbs (all the chandelier's I bought came WITHOUT lightbulbs which is fine since I could pick the color temperature I wanted but I didn't realize. I did 5000K in the kitchen and 4000K throughout the house.

-Floor Vents (for bathrooms and laundry)

-Ceiling Vents

-4 Hole, Door Hinges (for our outdoor/indoor doors)

-Stair Brackets (for the railing to sit on)

-Pocket Door Handle (our painter had accidentally painted it)

- Valves for the washing machine


The small details I remembered to account for:

-Outlets

-Light switches

-Light plates (theres 1-gang, 2-gang, 3-gang depending on what you need)

-USB outlets

-Smart WIFI dimmers (we wanted smart ones so we could turn the lights on for our pup Misia when we're at work during the winter and it getting dark early)

-Cable insert plug

-Recessed lights

-Inside door handles

-Handles for outside doors

-Cabinet handles/pulls/knobs (for laundry and kitchen)



See below for all of them



If you have trouble viewing those on a mobile here are most of them:





You can follow all our home reno youtube videos here!

All my home reno blog posts are also here


You can find more house videos on my insta stories and vlogs


Don't forget to check out my Amazon Page that lists all my favorites on there- clothing, bathing suits, beauty products and more. Also I post a bunch of videos on my youtube channel!

xoxo ela

Updated: May 19


Hi!!

I thought I would write up this timeline and post it to give people an idea of how long it actually took us to reno our house. And also because I was taking notes on my phone to give myself an idea of when we'd be actually done! :)


You can follow all our home reno youtube videos here!

All my home reno blog posts are also here


BOUGHT OUR HOUSE

December 6th: Closed on our house

All of December and beginning of January: Had contractors come by to give us quotes


FLOOR

January 8th: Picked our floor guy (wood was ordered: 5 inch white oak)

January 13th: Demo started

January 18th: We saw samples of colors on the wood that was delivered.

January 27th: Floors were started

February 1st: Floor install was done

February 7th: Sanding completed

February 8th: We chose our final stain color (after seeing his samples)

February 13th: Floor staining was completed

Week of February 17th: Floors were covered and most doors installed after being painted.



WOODWORK

February 15th: Contractors stopped by to give me measurements for ordering material for woodwork (baseboards, door casings, paneling)

February 17th: I placed orders for baseboards, door casings, wood paneling, crown molding and a few closet doors

February 24: Delivery of all wood

Week of March 2nd: Baseboards and door casings starting to get installed on 2nd floor

Week of March 9th: Baseboards and casings installed on 1st floor


TILE

February 22nd- Ordered tile for laundry and bathroom floors

February 25th- Tile delivered

March 7th- Heated floors installed in laundry and bathroom

March 12th-13th- Tile in laundry and powder bath installed

April 30th- Backsplash for kitchen installed

Week of May 4th- Backsplash for laundry installed



ELECTRICAL

Week of March 2nd: Electrical done for adding recessed lighting in 6 rooms


PAINT

January 28th: Doors taken to painters shop to paint

Week of March 9th- 2nd floor window trim and ceilings painted.

Week of March 16th- We had to fire our painter...

Week of March 23rd- New painters started covering all floors correctly and patching walls. Windows also primed on first floor along with front and back door.

Week of March 30th- 2nd floor painted

Week of April 6th- First floor painted and brick fireplace

Week of April 12th- Wallpaper in powder bath installed



CABINETS/ LAUNDRY AND KITCHEN

March 9th- Ordered laundry cabinets

Week of April 6th- Laundry cabinets were installed

April 17th- Kitchen cabinets were installed

Week of April 20th- Laundry sink and kitchen sink installed

April 29th- Countertops were installed

Week of May 4th - Appliances installed

May 11th- Hood and floating shelves installed



FINAL TOUCHES

March 1- Ordered most lights and chandeliers

March 8- Ordered all new outlets and light switches

March 15- Ordered all recessed lights

Week of March 30th- All outlets and light switches put on on second floor

Week of April 6th- All door handles put on

Week of April 12th - Lights/chandeliers were installed

Week of April 27th- Powder bath toilet, vanity, sink installed

May 11th- Cabinet handles installed


PAPER OFF AND LIVABLE- MAY 7TH!!


We finally got the paper off the floor May 7th and cleaned the house but everything was actually completed (like the kitchen hood and oven installed) on May 11th. A long almost 5 total months.


Don't forget to follow me on instagram and check out my Amazon Page that lists all my favorites on there- clothing, bathing suits, beauty products and more. Also I post a bunch of videos on my youtube channel!

xoxo ela

ABOUT

Hi, I'm Ela! I started this blog to share all my knowledge of fashion, home decor, travel and more. I previously worked as a men's model agent (see that post here) and now I work in advertising. Majoring in Fashion Business, I've always had a love towards fashion and love sharing about it. I get so excited getting pieces for a steal (my Polish background does that to me,) I love to travel anywhere and everywhere, and I love interior decor and turning something old into something beautiful and new.

 

From traveling, fashion, home decor, happiness and health, follow here to see more.

 

CLICK FOR MORE FACTS ABOUT ME

PLACES I LIKE TO SHOP

amazon-transparent-logo-4.png

MY RECENT YOUTUBE VIDEOS

  • Black Pinterest Icon
  • Black Twitter Icon
  • Black Facebook Icon
bloglovin link